Blow-off Valve mastery and Dynamat artistry
Friday, 27 April 2007 | Comments (0) | Categories: Audio, Engine, Interior
First up, sorry about the delay in the posting. I've been on holiday for a week and just haven't had a chance to post up. But now we are now finally able to reveal the BOV setup. This took quite some time to work out mainly because of the size of the GReddy Type-R blow-off valve that I'm using and because I wanted it setup in a recirculating configuration. The pipework was worked up over a couple of days between other things, and then finally painted with the VHT Brake Caliper Silver and Clear overcoat. Jury is still out on whether they would look better in black, but for now they look pretty nice. For the intercooler setup, all the hoses were changed from the blue silicon that came in the Hybrid kit for black Samco silicon hoses. Don't think we've seen another setup like this before but it's neat and tidy.
- Air filer side with Z32 AFM and BOV
- Overhead of GReddy Type-R and pipework
- Intake Plenum intake pipework
The next few weeks I'll be focusing on getting the interior ready for stereo and trim, this means covering as much as possible with Dynamat. Some of you might be thinking about all the extra weight it will add, but then I'll just have to turn the boost up. The main reasons for the Dynamat is sound quality from the stereo, and making the interior livable. Just from putting it on the doors and roof, the difference to the way the roof sounds when you tap and the doors feel in closing is amazing. No more flimsy S13. Feeling much more like a Skyline now.
Dynamat Application Pics:
- Drivers Door
- Passenger Door
- Bootlid
- Roof
The firewall, floor, rear wheel arches and boot floor are still to be done, hopefully the amount I have left should be able to cover it.
Just a little extra bit done was the radiator cap. To match the RG Radiator, I've put on an RG Power Radiator Cap.
- RG Power Radiator Cap
- RG Radiator with Cap
A special thanks to Boney and Josh at C-Red for doing a little after hours work. Boney for helping with welding up the pipe work for the BOV setup/intercooler, and Josh for finding and removing an ECU loom for Sillbeer, thanks fellas (Dally put me up to this).
Cabin Autosalon is fast approaching now, so the aim is to have it all run in and completed by then. If it's not 100% complete, it'll be going in anyway.
Cheers
Brendan